They Hated This Bathroom Until A Bold Green Redo Made It Modern
AIThis post was created with the assistance of artificial intelligence (AI).

TL;DR

Before you orderOffer from Amazon

Get cleaning gear delivered free with Prime

  • Fast, free delivery on millions of items
  • Prime Video, Amazon Music and more included
  • Member-only deals all year
Start your free Prime trial Free trial for eligible customers · Cancel anytime
As an affiliate, we earn on qualifying purchases.

Designer Carmeon and her husband renovated a bathroom they had found dated and difficult to use, completing the work in just over six weeks alongside a master-bedroom renovation. The redesign features vertical army-green subway tile, Carrara marble flooring, a skylight and a custom caned vanity; the project’s cost was not provided.

Designer Carmeon and her husband replaced a dated, cramped bathroom with a redesigned space featuring army-green tile, brighter flooring and a custom vanity, in a renovation that took just over six weeks. Apartment Therapy reported that the work was part of a broader project that also included the master bedroom; the article did not disclose the project’s cost.

Carmeon told Apartment Therapy the original bathroom was usable but no longer met the couple’s needs. She described cracked, dingy tile and grout, a vanity she considered too short, unattractive swirling gold countertops and a bathtub that felt too small. She and her husband had lived in the home for three years before deciding to renovate.

The layout was another source of frustration. Two swinging doors—one for the bathroom entrance and one for a closet—sat diagonally across from each other, making it difficult to move around, particularly when both residents used the room. Carmeon also said items could disappear into the back of the old vanity drawers.

Carmeon designed the new room, while a contractor handled the work from demolition through completion. The vanity wall now has vertically stacked green subway tile, with Behr’s North Woods paint selected to coordinate. Carrara marble flooring and a new skylight bring lighter surfaces and additional daylight into the room. A vintage piece was fitted to serve as the basis for a custom caned vanity, paired with mirrors from Amazon and sconces from Blueprint Lighting.

At a glance
reportWhen: Renovation completed in just over six w…
The developmentAn Apartment Therapy before-and-after report details Carmeon’s bathroom renovation, including its bold green tile, functional changes and six-week-plus timeline.

A More Usable, Personal Bathroom

The project illustrates how the renovation addressed both appearance and daily use. The couple’s complaints were not limited to dated finishes: the doors obstructed movement, the vanity storage was frustrating, and the bathtub did not suit their preferences. The redesign gave Carmeon a chance to make choices around how the household uses the room, rather than simply replacing old surfaces with new ones.

The green tile is the most visible design decision, but the brighter marble floor and added skylight also shape the result. Together, those elements balance a darker wall treatment with lighter surfaces and daylight. The report does not provide measurements or performance data, so it cannot establish how much the layout or storage improved; those changes are presented through Carmeon’s account and the before-and-after description.

For readers planning similar work, the story offers a specific example of a substantial bathroom redo coordinated with a bedroom renovation. It also shows the trade-offs involved: the project took more than six weeks and had reported delays and plumbing problems, even though Carmeon said she was pleased with the final design.

Amazon

green subway tile for bathroom

As an affiliate, we earn on qualifying purchases.

As an affiliate, we earn on qualifying purchases.

Three Years Before the Remodel

The supplied Apartment Therapy report says Carmeon and her husband had lived in the home for three years before committing to the renovation. They had put up with the room’s dated finishes and awkward door arrangement during that time, then hired a contractor to carry out the work while Carmeon developed the design.

The bathroom was renovated as part of a project that also covered the master bedroom. The report says the work took just over six weeks, but it does not give a calendar start or completion date. It also notes setbacks, including subcontractors who did not show up and plumbing issues. No itemized budget, product prices, exact room dimensions or detailed construction specifications are included in the supplied source material.

“It wasn’t awful, but it was totally dated and lacked some of the function we needed for our everyday lives.”

— Carmeon, speaking to Apartment Therapy

Budget and Layout Details Missing

The supplied report does not state how much the renovation cost, whether the doors or room layout were physically changed, or what specific storage modifications replaced the old drawer arrangement. It describes the previous door conflict and the new finishes, but does not provide enough construction detail to confirm exactly how those functional problems were resolved.

The report also gives no project dates, precise measurements or information about permits and materials beyond the named finishes and fixtures. Carmeon’s satisfaction and descriptions of the old bathroom are attributable to her; they are not independently measured findings. The source does not provide a contractor’s account or a separate assessment of the completed work.

No Further Project Update Reported

The supplied Apartment Therapy article presents the renovation as completed and provides no announced next phase, follow-up date or additional work planned for the bathroom. Carmeon’s next steps are not specified. Readers seeking to compare the project with their own plans would need more information about the budget, scope, room dimensions and how the door and storage issues were addressed.

Key Questions

How long did the bathroom renovation take?

Apartment Therapy reported that the renovation took just over six weeks. The work also included a renovation of the master bedroom.

What are the main design features?

The redesign includes vertically stacked army-green subway tile, coordinated North Woods wall paint, Carrara marble floors, a skylight and a custom caned vanity made using a vintage piece. Mirrors and sconces complete the vanity area.

Why did the couple renovate the bathroom?

Carmeon said the room had cracked, dingy tile and grout, a vanity she found too short, unattractive countertops and a bathtub that felt too small. She also said two opposing swinging doors made it difficult to move around.

How much did the remodel cost?

The supplied report lists the project cost as not available. It does not provide a total budget or itemized expenses.

Who designed and completed the work?

Carmeon designed the bathroom, and the couple hired a contractor to manage the renovation from demolition through completion. The report does not name the contractor.

Source: rss

HALLOWEEN

Halloween Picks

As an affiliate, we earn on qualifying purchases.

You May Also Like

These Cheat Codes To Identify Paint Went Viral — But Do They Work For All Paint?

A hardware-store video shows color bands on certain Do it Best cans, but paint-can color codes vary by brand. Check the printed label before buying.

Century-old Bungalow In Singapore Built By Malay Businessman Proposed For Conservation – VnExpress International

A historic bungalow in Singapore, built by a Malay businessman over a century ago, is now proposed for conservation, sparking renewed interest in heritage preservation.

Apple HomeView Is Here — Alongside A New Apple TV, HomePod Mini And A Wave Of Matter Gear

Apple announced a $299 HomeView smart display, an updated Apple TV 4K and HomePod mini 2, plus Matter accessories from LG and Schneider.

Sila Realty Trust Surges In Global Coverage

Sila Realty Trust experiences a surge in international media coverage, with 23 mentions in recent reports, highlighting increased global interest.